Building 200 Exterior Infrastructure, ADA Walkway and Patio
Project Status: Under Construction
Completion Anticipated: August 11, 2019
Architect: Nichols, Melburg & Rossetto
Contractor: Aztec Construction
The exterior of the 200 Building, which houses the Shasta College Library is undergoing some renovations. Some of the infrastructure which has been in place since the college was built will be replaced. The infrastructure that is being upgraded are sewer lines, electrical, and data. When the infrastructure is complete, the 200 building will become ADA compliant with a new walkway and patio area off of the southeast corner near the redwood grove.